
Works with chain sizes: NH720S, NM720S, PM720S, NCS720S, and other 700-series non-metallic wastewater chains.
Chain Pin Pusher Tool Instructions
Assembly Step 1:

Place the pin pusher tool in the correct position with the pin aligned with the hole.
Important Step 1 Note:

When aligning the tool with attachment links pay close attention to the notch location on the link it's self and the tool position, make sure the tool is positioned like the photo above.
Assembly Step 2:

Once everything is aligned, turn the handle to press the pin in.
Assembly Step 3:

Simply continue to turn the handle until the pin is completely pressed into the link. At this point the pin assembly is complete.
Disassembly Step 1:

Align the pin of the tool with the pin of the chain on the side of the chain that is not notched.
Important Step 1 Note:

When aligning the tool with attachment links pay close attention to the notch location on the link it's self and the tool position, make sure the tool is positioned like the photo above.
Disassembly Step 2:

Turn the handle to begin pushing the pin out of the chain.
Disassembly Step 3:

Continue to push until the pin is all the way out and safe to remove.
If you have any additional questions about pin removal and pin placement please don't hesitate to contact us. We also supply a full line of wastewater chain, wastewater sprockets, bearings, motors, pumps, wear components and much more.